| Gas and Oil | |
|
Revisions to crude oil storage tanks $ 580,000
The project consisted of installing new SAAB temperature compensated radar level detectors and installing new stilling wells in 49 tanks. The work required following many very stringent safety rules to work in this hazardous environment. Mid States Electric completed all of the mechanical installation of the stainless steel inserts in the stilling wells as well as all of the electrical cabling and terminations.
|
|
|
Various Locations in Iowa
Revisions to Natural Gas metering We installed the electrical metering and instrumentation piping on several stations throughout the state of Iowa. Mid States Electric has all of the equipment to install stainless steel instrumentation piping and has received Swagelok training for the installation of their products. |
|
1658 Highway 20
Sioux City, Iowa 51106
712-202-0977